How to Set Up HiGlide Ceiling Tracking for Studio Lighting
By The Flash Centre | Published: 2026-10-26
Category: How-to Guides
Learn how to install HiGlide ceiling tracking for studio lighting, including support rails, drop ceiling supports, and cable fixing kits.
Quick Answer
To set up HiGlide ceiling tracking, first plan your layout and gather components, then install the support rails and drop ceiling supports, and finally attach your lights and manage cables with a cable fixing kit.
Why Choose HiGlide Ceiling Tracking
HiGlide ceiling tracking offers a flexible and professional solution for studio lighting, allowing you to position lights exactly where you need them without floor stands cluttering your space. The system is built from structural-grade aluminium, making it strong yet lightweight.
One key consideration is installation risk: self-installation is done at your own risk, so if you're not confident, it's wise to hire a professional. The Flash Centre can provide a quotation for professional installation.
Step-by-Step Installation Process
- Plan Your Layout: Measure your studio space and decide where you want your lights to be positioned. Mark the ceiling points where the support rails will be attached. Ensure you have all the necessary components: support rails, drop ceiling supports, and cable fixing kits. Double-check your measurements and that the ceiling can support the weight of the system.
- Install the Drop Ceiling Supports: Attach the HiGlide drop ceiling supports to the ceiling at your marked points. These fixed-length supports are designed to position the rails at the correct height, typically recommended at 3.5m from the floor. Use appropriate fixing hardware for your ceiling type. Ensure the supports are level and securely anchored before proceeding.
- Mount the Support Rails: Lift the HiGlide support rails and attach them to the drop ceiling supports. Make sure the rails are aligned and level. The rails come with end stops to keep your light carriers from sliding off. Check that the rails are straight and that the end stops are securely in place.
- Attach Lights and Accessories: Slide your light carriers or pantographs onto the rails and attach your lighting fixtures. Ensure they move smoothly along the track and lock in position as needed. Test the movement of each light to ensure it glides without obstruction.
- Manage Cables with the Fixing Kit: Use the HiGlide cable fixing kit small bands to attach mains cables to the outside of pantographs and cable transfer runners. This keeps cables organized and prevents them from tangling or interfering with movement. Leave some slack in the cables to allow full range of motion without strain.
- Test the System: After installation, test each light's movement and ensure all connections are secure. Verify that the cables do not snag and that the system operates smoothly. Perform a final safety check on all fixings and supports.
Key Components for Your HiGlide Setup
- HiGlide 3m Support Rail (Single) inc. End Stops: The HiGlide 3m Support Rail is manufactured in the UK from structural grade aluminium, ensuring a strong but lightweight system. This rail forms the backbone of your ceiling tracking, providing a secure and durable track for your lights.

HiGlide 3m Support Rail (Single) inc. End Stops - HiGlide 100cm Drop Ceiling Support: The HiGlide 100cm Drop Ceiling Support is a fixed-length support that allows the rails to be fixed at the correct height for effective operation. Using these supports ensures your rails are hung at the recommended height, which is crucial for smooth operation and safe clearance.

HiGlide 100cm Drop Ceiling Support - HiGlide Cable Fixing Kit Small Band (Set of 10): The HiGlide Cable Fixing Kit Small Band includes a set of 10 bands to attach mains cables to the outside of pantographs and cable transfer runners. These bands keep your cables tidy and out of the way, preventing tangles and trip hazards in your studio.


